Job Tracking Process

Job tracking Process is another criteria that you can use to track the job or jobs by.

As an example you may have Job tracking statuses of

  • Unstarted

  • In production

  • completed, and

  • Cancelled

and a job has been set to production commenced but you want to know which part of the process the job is sitting at, so the job might start at Fabric cutting, then move to Tube cutting, then to Brackets and finish with Painting

  • Fabric cutting,

  • Tube cutting,

  • Brackets

  • Painting

  • Completed

You can leave the job set as production commenced and change the Job Tracking Process as required, this can be done by scanning the barcode on the job sheet or manually updating the job in the BUZ interface.

 

Field

Description

Field

Description

Description

Full text description of process, maximum 30 characters.

Code

Abbreviation for status, maximum 10 characters.

Days To Complete

Arrive in Factory - Finished production (Includes public holidays)

Capacity

For each day of the week the number of minutes production that can be carried out on the day. 480 minutes = 8 hours x 60 minutes

Sequence Number

The order the status list in the dropdown. This also sets the logical order these occur in so when order items have different statuses the one highest up the list is displayed as the order's despatch status.

Colour

Choose the colour to be associated with this status in Despatch Tracking and Customer Tree.

Note: The system has a default Job Tracking Process of ALL automatically configured.