An overview on where to find the settings around dispatch scheduling calculations.

...

Production Extra DaysAdds extra days to production/Job tracking days. Allows you to have multiple products with different lead times on 1 job tracking line
Install Standard MinutesThis is the time in minutes that items from this group are allocated to install. (If you dont require dispatch for this group set this to -1)
Multiply install minutes by Square MetresIf this is ticked the Install Time is Per Square Metre, not per item.
Check Measure Lead daysThis is the lead time in days it takes to complete a check measure form when order is accepted to check measure complete
Production standard minutesThis is the time in minutes it takes to manufacture this group
Check Measure standard minutesThis is the time in minutes it takes the check measure this group



3

...

Settings →  Inventory Items →  Search for the Inventory group & select → Edit details → Update the Extra Production or Extra Installation Time fields → Save

Image Removed

4.  Job tracking process- how long it takes to complete the production of the Job tracking process

Settings → Work Timing & Tracking Settings → Job tracking Process



54. Extra lead days depending on the dispatch type.

...

Estimated Time Between JobsIn minutes, is used when calculating capacity for a day.
Days of the Week
  • Number of minutes work at standard time that can be carried out on the day by this installer. 480 minutes = 8 hours x 60 minutes

...