An overview on where to find the settings around dispatch scheduling calculations.
...
Production Extra Days | Adds extra days to production/Job tracking days. Allows you to have multiple products with different lead times on 1 job tracking line |
Install Standard Minutes | This is the time in minutes that items from this group are allocated to install. (If you dont require dispatch for this group set this to -1) |
Multiply install minutes by Square Metres | If this is ticked the Install Time is Per Square Metre, not per item. |
Check Measure Lead days | This is the lead time in days it takes to complete a check measure form when order is accepted to check measure complete |
Production standard minutes | This is the time in minutes it takes to manufacture this group |
Check Measure standard minutes | This is the time in minutes it takes the check measure this group |
3
...
Settings → Inventory Items → Search for the Inventory group & select → Edit details → Update the Extra Production or Extra Installation Time fields → Save
4. Job tracking process- how long it takes to complete the production of the Job tracking process
Settings → Work Timing & Tracking Settings → Job tracking Process
54. Extra lead days depending on the dispatch type.
Settings → Workflow Timing & Tracking Settings → Dispatch Types
6. How long until the Installer can schedule the install
...
Estimated Time Between Jobs | In minutes, is used when calculating capacity for a day. |
Days of the Week |
|
...