An overview on where to find the settings around dispatch scheduling calculations.

...


Tracking Lead Time

This is the minimum number of days before production can commence to allow for ordering of fabric & components. So even if there is no production nothing will be scheduled on this Job Tracking Line until on or after the Lead Time. Enter 0 (zero) for immediate start.

Days to complete

Arrive in Factory - Finished production (Includes public holidays)

Production capacity

For each day of the week the number of minutes production that can be carried out on the day. 480 minutes = 8 hours x 60 minutes This is so that different products can be manufactured on the same Production Line e.g. Roller Blinds and Romans. If number of units is the preferred count then set Capacity to the number of units and in the Inventory Group set Production Standard Time to 1 (one).





2.  Settings →  Inventory Groups →  Groups

...

Settings →  Inventory Items →  Search for the Inventory group & select → Edit details → Update the Extra Production or Extra Installation Time fields → Save


Image Modified


4.  Job tracking process- how long it takes to complete the production of the Job tracking process

...

Estimated Time Between JobsIn minutes, is used when calculating capacity for a day.
Days of the Week
  • Number of minutes work at standard time that can be carried out on the day by this installer. 480 minutes = 8 hours x 60 minutes

...